FORM -A
PERCENTAGE RATE TENDER AND CONTRACT FOR WORKS
TENDER FOR WORKS
I/We hereby tender for the execution, for the JLN Sugar Mill Sarvardevla of the work specified in the under written memorandum within the time specified in such memorandum a(in figures) ……………………………………………… (in words) ………………………………………. Percent below/ above or at SOR the rates entered in the schedule mentioned in rule 1 and in accordance in all respects with the specification, designs, drawings and instructions in writing referred to in rule 1 there of and in annexed conditions, and with such materials as pare provided for, by and in all other aspects in accordance with such condition as for as applicable .
MEMORANDUM
Name of work – Construction of Boundary wall at JAWAHARLAL NEHRU SAHAKARI
GRICULTURAL PRODUCE PROCESSING SOCIETY LTD. SUGAR FACTORY
UNIT, VILLAGE- SARVAR DEOLA, DISTT-KHARGONE(M.P.)-
b) Cost or work put to tender - 29.50 lacs
c) Earnest money - 50.000/-
d) Security deposit ( including earnest money) as per rules.
e) Percentage , if any to be deducted form Bills for income tax and comr.
Tax. As per rules
f) Time allowed for the work from date of written order to commence 2 Months 15 days including rainy season .
Should this tender be accepted,I/we hereby agree to abide by and fulfill all terms and provision of the said condition of the contract annexed here to as for as applicable or in default ,therefore to forfeit and to pay the society or his successors in office the sums of money mentioned in the conditions, A separate sealed cover duly superscripted containing the sum of Rs. 50,000/- As earnest money the full value of which is to be absolutely forfeited by the society or his successors if office, without prejudice to any other rights or remedies by the said society or his successors in office, should I/we fails to commence the work specified in the above memorandum ,of should . I/we not deposit the full amount of security deposit specified in the above memorandum in accordance with clause 1 of the said condition of contract, the said sum of Rs. 50,000-00 shall be retained by society on account of security deposit as aforesaid .
--------------------------------------- Signature of witness to Before Date ------------------ day of ----------------- Address of witness ------------ Occupation of the witness --------------- |
------------------------------------------- Signature of the contractor submission or Tender Dated the ------------- day of ------------- |
Jawaharlal Nehru Sahakari Agicultrual Produce Processing Society Ltd. Khargone |
|
||||||||
Sugar Mill unit Sarvar Devla Dist. Khargone (M.P.) Schedule of item for Construction of Boundary Wall |
|
||||||||
S.N. |
Description |
Unit |
Qty. |
|
|||||
1 |
S.O.R. Item No. 15.33 Dismantling barbed wire or flexible wire rope in fencing including making rolls and stacking within |
kg. |
590.94 |
|
|||||
2 |
50 metres lead. S.O.R. Item. No. 15.31.1 Dismantling and stacking within 50 metres lead. fencing posts or struts including all earth work and dismantling of concrete etc. in base of. T' or L' iron or pipe |
each |
325.00 |
|
|||||
3 |
S.O.R. Item No. 2.8 Earth work in excavation by mechanical means (Hydraulic Excavator) manual means in foundation trenchs or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m, (No extra lift is payable if work is done by mechanical means) All kinds of soil. |
cum |
38.80 |
|
|||||
4 |
S..O.R. No. 2.9.1 Excavation work by mechaical means (Hydraulic excavator)/ manual means in foundation trenches or drains not exceeding 1.5 m in width or 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50m. Ordinary rock |
cum |
106.92 |
|
|||||
5 |
S.O.R. No. 2.33 Making bore holes for providing dowel bars at designed depth in rock foundation by drilling 40 mm dia bore hole in rock including necessary bending hooking, in position and grouting with cement slurry etc. complete as per drawing and specification. (Steel to be paid separately) |
metre |
84.00 |
|
|||||
6 |
S.O.R. Item No. 4.1.2.3 Proding and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level With 40mm nominal size graded stone aggregate. Nominal Mix- 1 Cement : 4 sand : 8 graded stone aggregate (M 7.5) |
cum |
19.44 |
|
|||||
7 |
S.O.R. Item No. 5.1.1 Proding and laying in position specified grade of reinforced cement concrete (with 20mm nominal size graded stone aggregate) excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level |
Cum |
80.64 |
|
|||||
8 |
S.O.R. Item No. 5.2.1 reinforced cement concrete (with 20mm nominal size graded stone aggregate) in walls (any thick- ness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, posts and struts etc. above plinth level and up to floor two level excluding cost of centering, shuttering, finishing and reinforcement. M20 - Grade Concrete |
Cum |
14.40 |
||||||
9 |
S.O.R. Item No. 5.2.2 reinforced cement concrete (with 20mm nominal size graded stone aggregate) in walls (any thick- ness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, posts and struts etc. above plinth level and up to floor two level excluding cost of centering, shuttering, finishing and reinforcement. M15 - Grade Concrete |
Cum |
14.00 |
||||||
10 |
S.O.R. Item No. 5.16.6 Reinforcement for R.C.C. work including straightening cutting, Bending, placing in position and binding including cost of binding wire up to floor two level including all wastage etc. complete.Thermo Mechanically Treated bars (TMT) |
cum |
9596.99 |
||||||
11 |
S.O.R. Item No. 5.9.1 Centering and shuttering including struitting, propping etc. and removal of form for. Foundation footings, bases of columns, etc. for concrete up to plinth level |
sqm |
718.08 |
||||||
12 |
S.O.R. Item No. 5.9.6 Columns, Pillars, Piers, Abutuments, Posts and Struts |
sqm |
288.00 |
||||||
13 |
S.O.R. Item No. 5.9.21 Lintels, beams, columns, girders, bressumers and cantilevers with water proof ply 12mm thick (item to be executed with prior permission of S.E. in case of B & R works and from Additional Project Director in case of PIU works) |
sqm |
140.00 |
||||||
14 |
S.O.R. Item No. 6.5.2 Brick work with well brunt open bhatta, bricks, crushing strength not less than 25kg/sqcm and water absorpt ion not more than 20% in foundation and plinth i/c curing etc. complete.Cement Mortar 1:6 (1 cement : 6 sand) |
cum |
13.10 |
||||||
15 |
S.O.R. Item No. 6.62 Brick work with well brunt open bhatta, bricks, crushing strength not less than 25kg/sqcm and water absorpt ion not more than 20% in superstructure above plinth level and up to floor two level i/c curing etc complete. Cement Mortar 1:6 (1 cement : 6 sand) |
cum |
196.56 |
||||||
16 |
S.O.R. Item No. 13.1.2 12 mm cement plaster of mix 1:6 ( 1 cement : 6 sand) |
sqm |
1470.00 |
||||||
17 |
S.O.R. Item No. 13.2.2 15 mm cement plaster on the rough side of single or half brick wall of mix. 1:6 (1 cement : 6 sand) |
sqm |
1330.00 |
||||||
18 |
S.O.R. Item No. 13.53.1 Finishing walls with water proofing cement paint of required shade New work (Two or more coats applied @ 3.84 kg/10 sqm) |
sqm |
2800.00 |
||||||
19 |
This entry was posted on October, 08, 2016 at 16 : 09 pm and is filed under Latest. You can follow any responses to this entry through the RSS 2.0 feed. You can leave a response from your own site.
Comments [1]
Williamdync
February, 12, 2017 at 22 : 18 pm
Search
Category
Recent Posts
Hi! Simply click below and type your query.
Our experts will reply you very soon.
Leave a Comment